Skip to content
  • linkedin
  • Facebook
  • linkedin
  • Facebook
The Planning master-For industrial engineer

The Planning master-For industrial engineer

This site is all about planning in an organization. Material planning, production planning, KPI and lean

Search
  • Home
  • KPI
  • Material planning
  • Production planning
  • Efficiency
  • About
  • Forum

Author: Gal Merom

HR KPI

21/04/2018 Gal Merom KPI Leave a comment

The HR is an important and crucial part of any organization. Every organization defines the HR a little differently. I

Continue reading

KPI: output

11/04/2018 Gal Merom KPI Leave a comment

The Output is the number of good products produced (not scrap). This KPI of course is one of the most important

Continue reading

Using past base data to forecast the demands

09/04/2018 Gal Merom Material planning Leave a comment

On this post: How to create a forecast from the past base data How to compare it with the sales

Continue reading

The basics of MRP planning

09/04/2018 Gal Merom Material planning 2 comments

Questions to be answered: 1. What is the purpose of MRP? 2. How the FG (finish goods) forecast become RM

Continue reading

Real time dispatch in Fabs

09/04/2018 Gal Merom Production planning Leave a comment

Real-time dispatching is used to control the flow of WIP in a FAB. The idea is to reduce WIP bubbles

Continue reading

KPI: Scrap

07/04/2018 Gal Merom KPI 2 comments

Scrap: The output of a production process that is not finished goods or WIP (work in progress). Scrap usually costs money

Continue reading

KPI: OEE

05/04/2018 Gal Merom KPI 8 comments

OEE – overall equipment efficiency OEE measures how efficiently you use your equipment. This is the most important production KPI to

Continue reading

KPI: Customer Complaints

05/04/2018 Gal Merom KPI Leave a comment

Customer complaints can help us improve. Using the customer complaints KPI the right way will let us know whether something

Continue reading

How Sawtooth model works – using inventory days

05/04/2018 Gal Merom Material planning One comment

 The classic sawtooth model is a really a good inventory model. However, the classic model uses quantities instead of inventory days.

Continue reading

KPI Maintenance

05/04/2018 Gal Merom KPI 4 comments

The most important thing in KPI maintenance is to reduce downtime of critical tools. And even more important is to reduce

Continue reading

Posts pagination

«Previous Posts 1 2

Categories

  • Costing (1)
  • KPI (6)
  • Material planning (8)
  • Processes (1)
  • Production efficiency (8)
  • Production planning (6)
  • shortish (1)
  • Uncategorized (6)

Sign up

Please sign to my mailing list





WordPress Theme: Tortuga by ThemeZee.